In preparing your assignment, ensure you include the following:
- provide an overview of the organisation and your role within it;
- identify the problem, explain why a solution is required and detail the outcomes the project will achieve;
- provide a project plan and budget;
- identify and detail the current skills and knowledge you possess and which will be tested in the preparation of the project; and
- explain the specific areas of theory you expect to be bridging in this placement.
Project Aim: Identify four scholarly articles, review those articles, and analyse and report on the information from a Project Management perspective
I have experience in mechanical engineering and an interest in quality management. I am unemployed and therefore cannot do an employer-based project. The university has accepted my request to perform a literature review of the management of quality in mechanical engineering projects. Quality Management has been always a considerable factor for the successful and efficient delivery of the mechanical engineering projects. There are many theories presented by scholarly researchers in this context however, the researchers have not provide higher concentration on the quality management in the quality sectors. Very few papers available on the context of the quality management in the mechanical engineering projects and thus, various aspects of the quality and its management in the context of the mechanical engineering.
This Project will result in the following outcomes:
- Quality Management focuses on delivery of the project within expected time and accomplishing the high quality output
- It is helpful in limiting the costs of the resources and the overall project
- It results in the enhancement of the customer satisfaction and quality improvement
- Limiting and eliminating the injuries of the employees
The overarching project objectives are:
- To identify the current practices and results of the total quality management in mechanical engineering projects
- To enhance the productivity and output of the mechanical engineering projects by 15% through enhancing the quality of the project
- To analyse the literatures presented by different authors in the context of the quality management in mechanical projects
- The expected time for driving the project would be for a week
Organisational Context
The company has been delivering the railway locomotives in Australia and it is the aim of the company to provide and deliver the best wagon and locomotive productions. The quality management will be helpful in enhancing and implementing the objectives as mentioned above. There are mechanical services those need proper consideration in the context of the quality of the production and safety of the individuals. The company had been continuously evolving and thus, raising its competitors and the quality needs to be maintained considering the internal and external environment of the organization.
This project will be including safety of the employees, resources being utilized, quality of the resources, production rate, and output quality. The wagons and locos should be of very high quality for ensuring the safety and speed for the local community. Recent development in the quality management, construction quality, need of the change, and implementing new quality management strategies. Cost spending on the implementation, market analysis, and primary research
Project Deliverables:
Education program, risk assessment & management pathway, improved awareness levels, schedule management, cost management, roles and responsibilities of the stakeholders, total quality management processes.
The Gaps will be identified through the literature review and thus, a survey can be driven for the identification of the customers’ perspective on the same context.
Human Resources including manager, supervisor, employees staffs, people, space to meet and access to a computer & internet, database management system, on site protective dresses.
There are the opportunities for this project for gaining the advantage of providing high quality materials, locos, and wagons to the society and enhancing the awareness of safety among the staffs working in the same environment. This project will be helpful in driving opportunities for the project through linking the key performance indicator, safety of the staffs and employees working on-site, enhancing the awareness, securing the local community, and providing the high quality product and services.
Organisational Context
Consider the risks early?
Assumptions Constraints
High quality resources will be available
Proper and regular data will be collected in response to the previous and future executions
Project will proceed as per the planning
Legal restriction will be passed through proper documentation
The production will be increased by 15% and costs will be reduced by 10%
Proper planning and risk register can be an effective measure for mitigating the risks Following are the considerable constraints of the project
Scope: enhance the overall revenue and production of the company through establishing effective and efficient quality management technique
Cost: the cost will be reduced by 10% through limiting the value of the resources, utilizing them in efficient and effective manner, and limiting the accidental ratios of the employees within the organization during the accomplishment of the mechanical works
Schedule: The research will be carried out for a week that will be focusing on the long term goal of the organization, which is two years
Quality: The skills and resource availability will be helpful in delivering the enhanced quality of the locos, wagons, and wheels, produced by James and Co.
There are the possibilities that the project facing escalation in the budget and schedule and thus, consideration of the risk based on their priority is an important concern
- Quality Management in Mechanical Engineering Projects
- Selection of the organization
1.1 James and Co.’s organizational structure identification
1.2 Identification of the Problem
1.3 Identification of the Feasibility of Quality Management
1.4 Scope, budget and schedule identification
- Literature Review
2.1 Identification of the scholarly articles on the same topic
2.2 Collecting data and important comments
2.3 Noting Down relevant information
2.4 Identifying the Gaps
2.5 Mitigating the identified Gaps
2.6 Reaching at a Conclusion
- Recommendation of better options for James and CO
3.1 Quality Management enhancement
3.2 Overall revenue
- Project Closure
4.1 Proof reading
4.2 Grammar Checking
4.3 Submission of the Literature review
Search for and select four suitable articles/case studies/texts for review.
Analyse the literature to identify topics within the articles on which to report.
- Quality Management in Mechanical Engineering Projects Tue 7/17/18
- Selection of the organization Tue 5/22/18
1.1 James and Co.’s organizational structure identification Thu 5/3/18
1.2 Identification of the Problem Wed 5/9/18
1.3 Identification of the Feasibility of Quality Management Wed 5/16/18
1.4 Scope, budget and schedule identification Tue 5/22/18
Mile stone 1: Identification of organization completed 5/22/18
- Literature Review Thu 6/21/18
2.1 Identification of the scholarly articles on the same topic Tue 5/29/18
2.2 Collecting data and important comments Fri 6/1/18
2.3 Noting Down relevant information Thu 6/7/18
2.4 Identifying the Gaps Tue 6/12/18
2.5 Mitigating the identified Gaps Mon 6/18/18
Project Deliverables
2.6 Reaching at a Conclusion Thu 6/21/18
Milestone 2: literature review Completed 6/21/18
- Recommendation of better options for James and CO Fri 7/6/18
3.1 Quality Management enhancement Thu 6/28/18
3.2 Overall revenue Fri 7/6/18
Milestone 3: Overall enhancement completed 7/6/18
- Project Closure Tue 7/17/18
4.1 Proof reading Tue 7/10/18
4.2 Grammar Checking Fri 7/13/18
4.3 Submission of the Literature review Tue 7/17/18
Milestone 4: Completed 7/17/18
What are their information needs
How & when will we provide them information about the pain management initiative
Subject Facilitator Lynton Ireland Regular communication Via weekly Zoom meetings or when necessary to progress my review.
New and Junior Students - The developed literature review and outcomes of the literature will be provided to them through library After the completion and submission of the literature review, the report will be uploaded and saved in the library
University - This will be helpful in enhancing the scope of the library and enlist one more research fort he university Approval and announcement will be made at the same instance and thus, the University will be informed about the research
Student Society - Better application and information on the quality management aspects that can enhance the productivity an d output of the organization They will be informed by online librarian or search engine of the University library
James and CO James and CO Research will be analysing the organizational operational activities and thus, recommendations will be made accordingly They will be informed through email after the completion of the research
PROJECT TEAM ROLES
Are the team members clear about their roles?
Executive Sponsor:
- [Please fill a Name]
- Role of the Executive Sponsor: The major role of the executive sponsor will be to provide necessary fund in manner to execute the research and develop the necessary output from the project.
Project Key Contacts:
Site Project Leader
- Name: [Please fill a Name]
- Email [Please fill an email]
- Phone[Please fill a Phone no.]
Review Process:
Regular weekly meetings will be delivered as per the growth and development of the project; brainstorming process will be delivered followed by the suggestions and problems queries. Every stakeholder will be asked to join the meeting and ensure his or her presence to speak and listen among every other stakeholder. Necessary data related to previous meeting, present meeting will be recorded in paper, and review will be done accordingly through estimating the quality and delivery of the project.
Start Date: Completion Date:
I have read and reviewed this project plan and agree to support the implementation project. Name:
1.1 James and Co.’s organizational structure identification 100 %
1.2 Identification of the Problem 100 %
1.3 Identification of the Feasibility of Quality Management 100 %
1.4 Scope, budget and schedule identification 100 %
2.1 Identification of the scholarly articles on the same topic 100 %
2.2 Collecting data and important comments 100 %
2.3 Noting Down relevant information 100 %
2.4 Identifying the Gaps 100 %
2.5 Mitigating the identified Gaps 100 %
2.6 Reaching at a Conclusion 100 %
3.1 Quality Management enhancement 100 %
3.2 Overall revenue 100 %
4.1 Proof reading 100 %
4.2 Grammar Checking 100 %
4.3 Submission of the Literature review 100 %
References
Chapman, W., 2018. Engineering modeling and design. Routledge.
Doi, T., Uhlmann, E. and Marinescu, I.D. eds., 2015. Handbook of ceramics grinding and polishing. William Andrew.
Kalpakjian, S. and Schmid, S.R., 2014. Manufacturing engineering and technology (p. 913). Upper Saddle River, NJ, USA: Pearson.
Mujumdar, A.S. ed., 2014. Handbook of industrial drying. CRC press.
Osten, W. ed., 2016. Optical inspection of Microsystems. CRC press.
Park, R., 2017. Value engineering: a plan for invention. Routledge.
Schleich, B., Anwer, N., Mathieu, L. and Wartzack, S., 2014. Skin model shapes: A new paradigm shift for geometric variations modelling in mechanical engineering. Computer-Aided Design, 50, pp.1-15.
Sun, D.W. ed., 2016. Handbook of frozen food processing and packaging. CRC Press.
To export a reference to this article please select a referencing stye below:
My Assignment Help. (2020). Project Management Of Quality In Mechanical Engineering Essay.. Retrieved from https://myassignmenthelp.com/free-samples/proj6016-employer-based-project2.
"Project Management Of Quality In Mechanical Engineering Essay.." My Assignment Help, 2020, https://myassignmenthelp.com/free-samples/proj6016-employer-based-project2.
My Assignment Help (2020) Project Management Of Quality In Mechanical Engineering Essay. [Online]. Available from: https://myassignmenthelp.com/free-samples/proj6016-employer-based-project2
[Accessed 19 August 2024].
My Assignment Help. 'Project Management Of Quality In Mechanical Engineering Essay.' (My Assignment Help, 2020) <https://myassignmenthelp.com/free-samples/proj6016-employer-based-project2> accessed 19 August 2024.
My Assignment Help. Project Management Of Quality In Mechanical Engineering Essay. [Internet]. My Assignment Help. 2020 [cited 19 August 2024]. Available from: https://myassignmenthelp.com/free-samples/proj6016-employer-based-project2.