Unit Learning Outcomes
LO1 Describe the construction industry with reference to company structures and other activities
LO2 Explain different types of construction companies within the market and their relationships within the tendering process.
LO3 Discuss the key stages in a construction project, and how Building Information Modelling informs the different stages.
LO4 Analyse how the construction industry has developed suitable collaboration strategies in support of greater recognition of health & safety.
Scenario
(Learners are to sketch this practical Construction Project scenario and use and apply it where specified or needed as a an example or case study especially in the consideration of construction materials, services and methods choices suggested)
You have been appointed to prepare an initial conceptual design and implementation report on Industrial Complex (2 km by 2 km) near a couple of near parallel highways 12km apart that both link the megacity of London to an international airport in the outskirts of London, Heathrow to be specific. The site of this complex is separated from one of the highways by a large fast flowing River that flows parallel to these highways and finally finds its way into the River Thames. This River which is about 20m wide lies in the middle of the 4 kilometer land space between the chosen Industrial complex site and one of the two highways.
The Client who is a private investor needs twenty (20) industrial building(s) and factories manufacturing baby foods, soaps, perfumes amongst several other commodities. This site is proposed together with some inter-connecting Infrastructure to the highway on the other side of the site 6 km away the river, which is not only necessary but required as a key element of the project. The factory buildings are made of both steel, concrete and other materials (to be specified). These industrial and factory buildings are provided as key structures of high specification that are intended to be built for the long term duration in this part of south of England, around the Heathrow Airport. The Industrial complex can be developed with steel or concrete or alternatives or a combination. The access interconnecting infrastructure roads to both highways can be flexible or rigid and the bridge across the stream and the walkway across the highways can be made of either RC concrete or steel, all in line with your choices for the project
LO1 Describe the construction industry with reference to company structures and other activities.
Task 1
(a) Explain how the construction industry has developed and encompassed professionalism within its structures.
(b) Demonstrate the scope and linkage between all parties within a construction organisation. In general and with respect to the scenario provided.
(c) Identify different types of contractual work tendered by contractors and justify the use of the specific type of tender for the given industrial complex scenario.
(d) Analyse how the construction industry has developed overall in terms of company structures, its employees and contracted work. Justify the company structure you will choose for the current scenario.
(e) Critically evaluate how construction companies have developed their structure and business ethos. What is its impact on the scenario provided?
LO2 Explain different types of construction companies within the market and their relationships within the tendering process
Task 2
(a) Identify the different types of construction companies in the market and the key features of different types. Suggest the type of Construction Company for the given scenario and justify its suitability.
(b) Explain the relationship that may exist between the companies working on the construction project.
(c) Analyse the link which connects construction companies.
(d) Compare the main factors which differentiate between construction company contracts and tenders.